This series of details stemmed from the desire to turn site-cast concrete formwork from something which is ritually obfuscated after its primary function is complete into an organizational datum which facilitates multiple processes after the concrete has cured and the form been removed.
Showing posts with label pile cuff. Show all posts
Showing posts with label pile cuff. Show all posts
Saturday, April 7, 2012
Venice Hospital: Generative Formwork
Concrete formwork is the oft-invisible figural negative to the concrete objects we know and love. While some architects succeed in allowing this object of formation to remain legible in the final product, the formwork marks are more often plastered over, sealed, hidden as carefully as possible, erasing the process from the final object.
This series of details stemmed from the desire to turn site-cast concrete formwork from something which is ritually obfuscated after its primary function is complete into an organizational datum which facilitates multiple processes after the concrete has cured and the form been removed.
This series of details stemmed from the desire to turn site-cast concrete formwork from something which is ritually obfuscated after its primary function is complete into an organizational datum which facilitates multiple processes after the concrete has cured and the form been removed.
Labels:
anchor,
architecture,
batter piles,
complexity,
concrete,
detailing,
formwork,
formwork anchor,
hospital,
insulation,
italy,
le corbusier,
pile,
pile cuff,
superplasticiser,
venice
Subscribe to:
Posts (Atom)
